Dan's Engine Buildup
Last Updated
12/31/09
Finally, there are enough parts to start assembling the engine.


400 Block bored .040 over, decked to 9" and Glyptal painted

ARP studs installed, Crank in, clearances checked

Crane Hyd Roller
222* and 230* @ .050
.509 and .528 Lift
112LSA

Cam dial in

Adjustable pushrod for determining the correct length

Lite springs help with checking
piston to valve
clearance and pushrod length

The Keith Black pistons and the Scat
5.7" rods are in.
I forgot how much fun spirolocks were to install.

Cam end-clearance checked and BHJ balancer installed.

GM Roller lifters, retainers, and tray installed

TFS Twisted Wedge heads bolted on and ARP bolts torqued

Pushrods and Crane roller rockers in place.

Edelbrock SY1 bolted in-place

Throttle body lid and magnesium valve
covers
check for fit, looks and clearance.

Finally!!
The engine is on the test stand.
You are
Visitor #
.